Epoxy Flooring at Silver Oaks

We were called by the management of Silver Oaks after inspecting the project of Epoxy Flooring already done under my supervision. We were told to apply 500 microns coating on the floor of pumps room.

The substrate conditions were not good enough for 500 mircons but they insist us for 500 microns only.

Grinding of Substrate

As a first step of surface preparation we started with the grinding of the substrate.

Epoxy Primer

 

After cleaning we applied epoxy primer

1st Scratch Coat

To cover undulations and pit holes in the floor we applied the scratch coat in colored epoxy.

Mitchell Construction Chemicals
Mitchell Construction Chemicals
Mitchell Construction Chemicals
Mitchell Construction Chemicals

Finishing of 1st Scratch Coat

We applied sand paper on the 1st scratch coat.

Mitchell Construction Chemicals
Mitchell Construction Chemicals

Skirting

A thin coat is applied on skirting.

Mitchell Construction Chemicals
Mitchell Construction Chemicals

2nd Scratch Coat

After inspection we decided to apply a second layer of scratch coat.

Mitchell Construction Chemicals
Mitchell Construction Chemicals
Mitchell Construction Chemicals

Final Layer

After applying 2 scratch coats we applied the final coat of 500 microns in demanded colors. Yellow lines were also applied.

Mitchell Construction Chemicals
Mitchell Construction Chemicals
Mitchell Construction Chemicals

As per the substrate conditions we believe that a 2mm or 3mm would be the much better solutions for this area.

This article is written by our RSM Mr. Rana Imran